F.M. Thomas Air Conditioning Inc. is an HVAC mechanical contractor with an emphasis on retrofit, repair and controls systems. We have a wide range of capabilities and self-perform sheet metal, piping systems, refrigeration systems, boilers, rigging, and controls wiring. F.M. Thomas Air Conditioning has 49 years’ experience in government contracting.
Cost $378,000.00
Description: Design-build CCN to Carrier IVu Controls System building upgrade. Installation and integration of economizers and power exhaust. Installed chilled water valves for air handlers and chiller.
Cost $790,000.00
Description: Installation of (2) custom Petra air handlers, new supply and return duct system, integration of existing BMS system, condensate and refrigerant piping.
Cost $1,207,000.00
Description: Replacement of (12) Lennox package units, modification of roof platforms, update existing Carrier CCN to Carrier IVu and integration with new economizers.
Cost $486,000.00
Description: Replacement of 200T BAC cooling tower, re-pipe to existing, installation of new steel structural I-beams, engineering design and permits.
Cost: $158,000.00
Description: Cabling Services for Incident-Driven Video Recording Systems (IDVRS) for 7 sites. Installed 2,150 linear ft of cable above tee bar. Mounted and installed (182) 115V power outlets and corresponding camera charging stations. Installed (6) new 30A electrical circuits from sub panels to secure storage rooms. Installed customer provided CAT6A patch cables. Mounted and installed Startech cabinets at each site. Produced cable data testing reports for each site. Final test out and submittals.
Cost $345,000.00
Description: Cabling Services for Incident-Driven Video Recording Systems (IDVRS) for 8 sites. Installed (274) network drops (CAT6A Cable). Installed approx. 4,500 linear ft of cable above tee bar. Installed approx. 400’ of fiber cable between MDFs and IDFs. Mounted and installed (274) 115V power outlets and corresponding camera charging stations. Installed (16) new 30A electrical circuits from sub panels to secure storage rooms. Installed CAT6A patch cables. Mounted and installed Startech cabinets per site. Produced cable data testing reports for each site. Final test out and submittals.
Cost $117,000.00
Description: Incident-Driven Video Recording Systems (IDVRS). Installed 43 CAT6A data lines from IDF 8, Server Room, to the Docking Station location. Installed new 2 Post Rack in Server Room, anchored and secured to existing ladder rack system above. Installed new CAT6A and fiber optic patch panels with new wire managements. Installed 24 strand single mode fiber from MDF to IDF 8 new rack. Fiber optic path required manhole safety equipment, traffic control and fresh air system to complete fiber optic installation. Terminated fiber optics using Fusion Splice LC connectors. Tested and labeled using a power meter for db loss and continuity. Terminated CAT6A IDF 8 patch panel and docking station location. Dressed cable to the panels. Tested CAT6A with the Fluke DTX tester. Labeled both ends of all cable. Installed customer provided docking stations and plugged in CAT6A patch cords to docking stations. Reconfigured existing electrical to meet design requirements. Installed 24 strand single mode fiber from MDF to IDF 11 (K9 Building). Installed fiber optic patch panel, and patch cords as done in IDF 8. Installed 2 CAT6A cables from IDF 11 to an existing dock area for 2 additional docking stations. Final test out and submittals.
Copyright © 2023 FM Thomas Air Conditioning - All Rights Reserved.